The project supported the modernisation of the irrigation facilities in 3,070 hectares. It replaced traditional surface irrigation systems with a new irrigation network using a sprinkling method, resulting in water savings and higher yields.

Photo:

Video:

Background

The irrigation community of sectors VIII, IX and X of the Flumen Canal covers an area of 3,000 hectares and 309 users. Irrigation in this area used to take place in a traditional way using mainly surface irrigation systems (implying significant labour costs), irrigation at night, land preparation requirements and few possibilities for sustainable crops (mainly winter cereal). Given this context and market pressures, modernisation of irrigation systems was seen as the only viable option.

Objective

The main objective was to modernise irrigation in the area by eliminating old irrigation infrastructure based on irrigation channels and constructing a new irrigation network using a sprinkling method. The distribution network ends in each plot allowing each farmer to modernise his/her holding. The new pressurised irrigation system is governed by remote irrigation automation and control.

Main activities

Key activities comprised on the one hand the physical elimination of old irrigation channels and on the other hand the construction of a 208,200 m3 dam and a pumping station. The new construction includes two main irrigation pipes, one with natural pressure for 1,995 hectares and another one with forced pressure for 1,075 hectares, both with the necessary network of pipes ending in irrigated fields.

Results & Benefits

Farmers have modernised 1,000 hectares to date, with another 700 hectares to be completed soon. Water savings achieved during the first year of irrigation were 30% in the cultivation of winter cereal – from 2,500 m3 to 1,800 m3. In addition to savings, better control has allowed irrigation to take place at the right time resulting in higher crop yields: winter cereal yields have increased from 5,000 kg/ha to 7,000 kg/ha, a factor that has motivated the participation of young farmers.

Lessons learnt

The success of the project rests on the cooperation of three irrigation communities (Sodeto, Alberuela de Tubo and Lalueza) which joined forces in order to carry out the works beneficial for the whole area. In addition, the project has proved that modernisation is critical for better and faster preparation of the soil, significant water savings, higher yields, incorporation of young people to agriculture and overall improved quality of life.

Project location and other information

Municipality of Alberuela de Tubo, Sodeto. Comarca de Monegros. Huesca province.

Region

Aragón

RDP Territory

Aragón

Total project cost (€)

23 233 634

EAFRD contribution (€)

6 689 485

National contribution (€)

8 142 383

Private contribution (€)

8 401 766

Contact name

José Víctor Nogués Barraguer and Pedro Campo Bescós

Telephone

+34 974 345421

Languages for contact

Spanish

Document attachment

Original Language version

At a glance

Country

Spain

Final beneficiary type

Producer groups

Budget range

> €500 000

Start date:

30/06/2008

End Date:

28/04/2011

Theme / Measure:

• Competitiveness of Agriculture & Forestry
• Restructuring, developing physical potential, and promoting innovation
• 121. Modernisation of agricultural holdings

Keywords:

Infrastructure, Irrigation, Modernisation, Water

Last update